MOXBA —  Plenary Oral Session, Hadron Accelerators   (15-May-17   10:00—10:30)
Chair: G. Arduini, CERN, Geneva, Switzerland
Paper Title Page
MOXBA1 Progress on the ESS Project Construction 7
 
  • R. Garoby
    ESS, Lund, Sweden
 
  The construction of the European Spallation Source (ESS) is advancing at a high pace with the support of many laboratories and institutions all over Europe. Prototyping and manufacturing for the accelerator are in full swing in more than 23 laboratories distributed over 12 European partner countries. The origin and goals of the ESS will be briefly outlined in this paper. The milestones achieved, both in Lund and at the partner labs will be described as well as the plans up to operations.  
slides icon Slides MOXBA1 [76.192 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOXBA1  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)