| Paper | Title | Other Keywords | Page |
|---|---|---|---|
| WET1H1 | Beam Instrumentation Needs for a Future Electron-Positron Collider Based on PEP-II Observations | ion, luminosity, vacuum, feedback | 157 |
|
|||
|
Funding: Work supported by US DOE/SU Contract DE-AC02-76SF00515. Future e+e− colliders will operate with many bunches, short bunch lengths, small emittances, high currents, and small interaction point betas. The stability of the colliding beams with these characteristics will depend on detailed, high precision, and continuous measurements. The various beam measurement requirements and techniques will be discussed using PEP-II observations as a starting point. |
|||
| DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-eeFACT2016-WET1H1 | ||
| Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
| THS2H3 | Summary of Beam Instrumentation and Beam Diagnostics Session | ion, electron, polarization, feedback | 220 |
|
|||
| This report is a summary of the beam instrumentation and beam diagnostics session of the eeFACT2016 workshop. | |||
| DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-eeFACT2016-THS2H3 | ||
| Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||