| |
- S. V. Kuzikov, A. A. Bogdashov, G. G. Denisov
IAP/RAS, Nizhny Novgorod
- K. M. Schirm, I. Syratchev
CERN, Geneva
- A. A. Vikharev
Omega-P, Inc., New Haven, Connecticut
| |
The X-band power test stand needed for preprocessing and testing of key CLIC RF components is being installed in the test facility CTF3. The test stand includes several 12 GHz XL5 klystrons (50 MW, 1.5 mks) and a pulse compressor of the SLED-I type to obtain over 120 MW peak power at 230 ns pulse length. A compact compressor of this type based on TE01-TE02 beating wave in high Q-factor compressors cavities has been designed, produced, and tested at low power level. For testing accelerating structures and so-called "CLIC recirculation principle" of its operation several -3 dB couplers and variable power attenuators were also produced and tested.
|
|
|
|