| Paper |
Title |
Page |
| MPPH077 |
Commissioning of the TRIUMF ISAC RF System |
945 |
| |
- K. Fong, S. Fang, M. Laverty, J. Lu, R.L. Poirier (TRIUMF)
|
|
| MPPH078 |
RF Control Systems for the TRIUMF ISAC RF Structures |
948 |
| |
- K. Fong, S. Fang, M. Laverty (TRIUMF)
|
|
| MPPH079 |
RF Measurement Summary of ISAC DTL Tanks and DTL Bunchers |
951 |
| |
- A.K. Mitra, P. Bricault, K. Fong, R.E. Laxdal, R.L. Poirier (TRIUMF) , A. Vasyuchenko (INR RAS)
|
|
| WPPH059 |
The TRIUMF Facility and Cyclotron Developments |
2584 |
| |
- G. Dutto, R. Baartman, P. Bricault, M. Dombsky, K. Fong, T. Kuo, R.E. Laxdal, G.H. Mackenzie, A.K. Mitra, M. Olivo, R.L. Poirier, K. Reiniger, L. Root, R. Ruegg, P.W. Schmor, M. Stenning, G. Stinson (TRIUMF)
|
|
| FPAH112 |
Beam Commissioning and First Operation of the ISAC DTL at TRIUMF |
3942 |
| |
- R.E. Laxdal, G. Dutto, K. Fong, G.H. Mackenzie, M. Pasini, R.L. Poirier, R. Ruegg (TRIUMF)
|
|