| Title |
Status Report on the SPIRAL2 Facility at GANIL |
| Authors |
- E. Petit
GANIL, Caen, France
|
| Abstract |
The GANIL SPIRAL2 project is based on the construction of a superconducting ion CW LINAC with two experimental areas named S3 ('Super Separator Spectrometer') and NFS ('Neutron For Science'). This status will report the construction of the facility and the first beam commissioning results. The perspectives of the SPIRAL2 project, with the future construction of the low energy RIB experimental hall called DESIR and with the construction of a new injector with q/A>1/6 or 1/7, will also be presented.
|
| Paper |
download TUA1IO02.PDF [1.807 MB / 6 pages] |
| Slides |
download TUA1IO02_TALK.PDF [22.004 MB] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
NAPAC2016, Chicago, IL, USA |
| Series |
North American Particle Accelerator Conference (3rd) |
| Proceedings |
Link to full NAPAC2016 Proccedings |
| Session |
Oral Presentations (MC4) |
| Date |
11-Oct-16 08:30–10:30 |
| Main Classification |
4: Hadron Accelerators |
| Keywords |
ion, rfq, linac, proton, experiment |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Volker RW Schaa (GSI, Darmstadt, Germany); Maria Power (ANL, Argonne, IL, USA); Vladimir Shiltsev (FNAL, Batavia, IL, USA); Marion White (ANL, Argonne, IL, USA) |
| ISBN |
978-3-95450-180-9 |
| Published |
January 2017 |
| Copyright |
|