<?xml version="1.0" encoding="UTF-8"?>
<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Akintola, A.E.T.</author>
             <author>Bainbridge, A.R.</author>
             <author>Hitchen, S.</author>
             <author>Lowe, M.</author>
             <author>Mason, D.A.</author>
             <author>May, A.J.</author>
             <author>Pattalwar, S.M.</author>
             <author>Shabalina, A.D.</author>
             <author>Smith, P.A.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             Magnetic Field Measurements and Shielding at the UKRI-STFC Daresbury Laboratory SRF Vertical Test Facility
          </title>
       </titles>
       <publisher>JACoW Publishing</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>2226-0366</isbn>
		 <isbn>978-3-95450-215-8</isbn>
		 <electronic-resource-num>10.18429/JACoW-LINAC2022-TUPOGE07</electronic-resource-num>
		 <language>English</language>
		 <pages>495-497</pages>
       <keywords>
          <keyword>cavity</keyword>
          <keyword>shielding</keyword>
          <keyword>simulation</keyword>
          <keyword>MMI</keyword>
          <keyword>SRF</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2022</year>
          <pub-dates>
             <date>2022-09</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE07</url>
              <url>https://jacow.org/linac2022/papers/tupoge07.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          A novel vertical test facility has been developed, commissioned, and entered steady-state operations at the UKRI-STFC Daresbury Laboratory. The cryostat is designed to test 3 jacketed superconducting RF cavities in a horizontal configuration in a single cool-down run at 2 K. A 2-year program is currently underway to test ESS high-beta cavities. Upon completion of this program, the facility will undertake a testing program for PIP-II HB650 cavities. In the current configuration, a solution combining passive and active magnetic shielding has been validated for the ESS requirement of field attenuation to the level of &lt;1 uT, although continuous field measurements are not provided. This paper reports the implementation of passive and active shielding, along with simulation and experimental measurements thereof.
       </abstract>
    </record>
  </records>
</xml>
