<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Ferdinand, R.</author>
             <author>Di Giacomo, M.</author>
             <author>Franberg, H.</author>
             <author>Kamalou, O.</author>
             <author>Lagniel, J.-M.</author>
             <author>Normand, G.</author>
             <author>Savalle, A.</author>
             <author>Uriot, D.</author>
             <author>Varenne, F.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             SPIRAL2 Injector Commissioning
          </title>
       </titles>
		 <publisher>JACoW Publishing</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>2226-0366</isbn>
		 <isbn>978-3-95450-194-6</isbn>
		 <electronic-resource-num>10.18429/JACoW-LINAC2018-THPO047</electronic-resource-num>
		 <language>English</language>
		 <pages>790-793</pages>
       <pages>THPO047</pages>
       <keywords>
          <keyword>rfq</keyword>
          <keyword>linac</keyword>
          <keyword>emittance</keyword>
          <keyword>cavity</keyword>
          <keyword>diagnostics</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2019</year>
          <pub-dates>
             <date>2019-01</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-LINAC2018-THPO047</url>
              <url>http://jacow.org/linac2018/papers/thpo047.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          The SPIRAL2 injector is composed of two ion sources (p/d and heavy ions up to A/Q=3) followed by a 730 keV/u RFQ. Beam commissioning has started in 2014 in parallel with the superconducting linac and HEBT installations. The RFQ beam commissioning started soon after the first RF conditioning done in October 2015. This paper describes the RFQ beam measurements done on the diagnostic plate for the reference particles (H⁺, 4He2+ and recently 18O6+) and the difficulties encountered for the RFQ commissioning at the A/Q=3 field level.
       </abstract>
    </record>
  </records>
</xml>
