<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Guo, J.</author>
             <author>Grames, J.M.</author>
             <author>Kazimi, R.</author>
             <author>Lin, F.</author>
             <author>Plawski, T. E.</author>
             <author>Rimmer, R.A.</author>
             <author>Wang, H.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             Pulsed Operation of CEBAF for JLEIC Injection
          </title>
       </titles>
		 <publisher>JACoW Publishing</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>2226-0366</isbn>
		 <isbn>978-3-95450-194-6</isbn>
		 <electronic-resource-num>10.18429/JACoW-LINAC2018-THPO004</electronic-resource-num>
		 <language>English</language>
		 <pages>682-684</pages>
       <pages>THPO004</pages>
       <keywords>
          <keyword>cavity</keyword>
          <keyword>injection</keyword>
          <keyword>electron</keyword>
          <keyword>linac</keyword>
          <keyword>beam-loading</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2019</year>
          <pub-dates>
             <date>2019-01</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-LINAC2018-THPO004</url>
              <url>http://jacow.org/linac2018/papers/thpo004.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          JLab Electron Ion Collider (JLEIC) is planning to use the recently upgraded 12 GeV CEBAF 1497 MHz SRF CW recirculating linac as a full-energy injector for the electron collider ring. The JLEIC electron injection requires 3-4µs long bunch trains with a 20-400ms spacing in between, resulting in uneven beam loading for the CW CEBAF. With the high beam current in JLEIC collider rings, the low duty factor of injection also requires to a very high pulsed beam current from CEBAF, exacerbating the transient beam loading issue. In this paper, we will present CEBAFs detailed pulsed operation scheme for JLEIC injection, as well as some experimental results at CEBAF.
       </abstract>
    </record>
  </records>
</xml>
