<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Bezditko, O.</author>
             <author>Karnaukhov, I.I.</author>
             <author>Zelinsky, A.Y.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             Survey and Alignment System of 100 MeV/100 kW Electron Linear Accelerator
          </title>
       </titles>
		 <publisher>JACoW Publishing</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>2226-0366</isbn>
		 <isbn>978-3-95450-194-6</isbn>
		 <electronic-resource-num>10.18429/JACoW-LINAC2018-MOPO028</electronic-resource-num>
		 <language>English</language>
		 <pages>87-89</pages>
       <pages>MOPO028</pages>
       <keywords>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2019</year>
          <pub-dates>
             <date>2019-01</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-LINAC2018-MOPO028</url>
              <url>http://jacow.org/linac2018/papers/mopo028.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          For successful operation and working of electron linear accelerator of "NEUTRON SOURCE" driver it is necessary that all the acceleration sections, the quadrupole triplets, the quadrupole lenses, the dipole magnets, the scanning magnets and the chicane should be installed in design position according design parameters. Accuracies of all electromagnetic elements installation are 150 mkm for all three rotation freedom. The whole process, fiducialization and developing of survey net, alignment is controlled by laser tracker Leica AT 401.
       </abstract>
    </record>
  </records>
</xml>
