| Title |
Status of SPIRAL2 and RFQ Beam Commissioning |
| Authors |
- R. Ferdinand, P. Bertrand, M. Di Giacomo, H. Franberg, O. Kamalou, J.-M. Lagniel, G. Normand, A. Savalle, F. Varenne
GANIL, Caen, France
- J.-L. Biarrotte
IPN, Orsay, France
- D. Uriot
CEA/DRF/IRFU, Gif-sur-Yvette, France
|
| Abstract |
The SPIRAL2 project beam commissioning is started and the superconducting linac installation is being finalized. In parallel with the installations, the first proton beam was extracted in 2014 and the expected beam performances were achieved from both light and heavy ion sources. The conditioning of the RFQ started in October 2015, and the beam commissioning soon after that. After having briefly recalled the project scope and parameters, the present situation of the RFQ beam commissioning is presented.
|
| Paper |
download WE1A06.PDF [1.675 MB / 5 pages] |
| Slides |
download WE1A06_TALK.PDF [19.488 MB] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
LINAC2016, East Lansing, MI, USA |
| Series |
Linear Accelerator Conference (28th) |
| Proceedings |
Link to full LINAC2016 Proccedings |
| Session |
Proton & Ion Accelerators & Applications/Technology |
| Date |
28-Sep-16 08:30–10:30 |
| Main Classification |
2 Proton and Ion Accelerators and Applications |
| Sub Classification |
2C RFQs |
| Keywords |
rfq, linac, ion, proton, ion-source |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Yoshishige Yamazaki (FRIB/MSU, East Lansing, MI, USA); Alberto Facco (FRIB/MSU, East Lansing, MI, USA); Amy McCausey (FRIB/MSU, East Lansing, MI, USA); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-169-4 |
| Published |
May 2017 |
| Copyright |
|