| Title |
Experience with the Construction and Commissioning of Linac4 |
| Authors |
- J.-B. Lallement
CERN, Geneva, Switzerland
|
| Abstract |
In the framework of the LHC Injector Upgrade program, CERN is presently commissioning Linac4, a 160MeV H⁻ ion linac, which will replace the present 50 MeV proton linac (Linac2) as injector to the PS Booster during the next LHC long shut-down. The installation of the machine has proceeded in parallel with a staged beam commissioning at the energies of 3, 12, 50, 100 MeV and finally 160 MeV, foreseen for fall 2016. A seven month long reliability run will take place during 2017 to access potential weak points and find mitigations. The lessons learnt during its construction, the main outcomes of the beam commissioning and the remaining steps toward its connection to the PS Booster are presented in this paper.
|
| Paper |
download TU1A03.PDF [0.605 MB / 6 pages] |
| Slides |
download TU1A03_TALK.PDF [5.747 MB] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
LINAC2016, East Lansing, MI, USA |
| Series |
Linear Accelerator Conference (28th) |
| Proceedings |
Link to full LINAC2016 Proccedings |
| Session |
Proton & Ion Accelerators & Applications/Beams |
| Date |
27-Sep-16 08:30–10:30 |
| Main Classification |
2 Proton and Ion Accelerators and Applications |
| Sub Classification |
2A Proton Linac Projects |
| Keywords |
linac, ion, emittance, DTL, cavity |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Yoshishige Yamazaki (FRIB/MSU, East Lansing, MI, USA); Alberto Facco (FRIB/MSU, East Lansing, MI, USA); Amy McCausey (FRIB/MSU, East Lansing, MI, USA); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-169-4 |
| Published |
May 2017 |
| Copyright |
|