| Title |
Towards Commissioning of the IFMIF RFQ |
| Authors |
- A. Pisent
INFN/LNL, Legnaro (PD), Italy
|
| Abstract |
All 18 sections of the IFMIF RFQ were completed in summer 2015. A 2 m section (the last three modules and one prototype used as RF termination) were RF tested at LNL at the design value of 90 kW/m in cw conditions. The three 3.3 m long supermodules were sent to Japan in January 2016. The RFQ was installed and tuned with fixed tuners to the nominal field frequency and field distribution. The very high design shunt impedance was achieved.
|
| Paper |
download TH1A05.PDF [2.023 MB / 6 pages] |
| Slides |
download TH1A05_TALK.PDF [23.395 MB] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
LINAC2016, East Lansing, MI, USA |
| Series |
Linear Accelerator Conference (28th) |
| Proceedings |
Link to full LINAC2016 Proccedings |
| Session |
Proton & Ion Accelerators & Applications |
| Date |
29-Sep-16 08:30–10:30 |
| Main Classification |
2 Proton and Ion Accelerators and Applications |
| Sub Classification |
2C RFQs |
| Keywords |
rfq, linac, vacuum, controls, impedance |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Yoshishige Yamazaki (FRIB/MSU, East Lansing, MI, USA); Alberto Facco (FRIB/MSU, East Lansing, MI, USA); Amy McCausey (FRIB/MSU, East Lansing, MI, USA); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-169-4 |
| Published |
May 2017 |
| Copyright |
|