| Title |
Operating Status of Injector II RFQ for C-ADS Project |
| Authors |
- L.P. Sun, Y. He, C.X. Li, L. Lu, A. Shi, L.B. Shi, W.B. Wang, X.B. Xu, Z.L. Zhang, H.W. Zhao
IMP/CAS, Lanzhou, People's Republic of China
|
| Abstract |
The Radio Frequency Quadrupole system has been designed and constructed for C-ADS (Chinese Accelerator Driven System) Injector II in Institute of Modern Physics (IMP), Chinese Academy of Sciences, which has been running for more than one year until now. It is a quadrilateral four-vane resonator with two equal couplers operating in CW mode. In the paper, RF system upgrade will be presented in detail,especially the two-port configuration was introduced and the conditioning based on two new sets of solid-state amplifier instead of the original tetrodes power source due to system hardware upgrade are described in the paper.
|
| Footnotes & References |
RFQ, solid-state amplifier, two-port configuration, coupler |
| Paper |
download MOPLR053.PDF [0.778 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
LINAC2016, East Lansing, MI, USA |
| Series |
Linear Accelerator Conference (28th) |
| Proceedings |
Link to full LINAC2016 Proccedings |
| Session |
Poster Session |
| Date |
26-Sep-16 16:00–17:00 |
| Main Classification |
2 Proton and Ion Accelerators and Applications |
| Sub Classification |
2A Proton Linac Projects |
| Keywords |
rfq, cavity, coupling, impedance, scattering |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Yoshishige Yamazaki (FRIB/MSU, East Lansing, MI, USA); Alberto Facco (FRIB/MSU, East Lansing, MI, USA); Amy McCausey (FRIB/MSU, East Lansing, MI, USA); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-169-4 |
| Published |
May 2017 |
| Copyright |
|