| Title |
The SARAF-LINAC Project Status |
| Authors |
- N. Pichoff, B. Gastineau, P. Girardot
CEA/DSM/IRFU, France
- N. Bazin, D. Chirpaz-Cerbat, B. Dalena, G. Ferrand, P. Gastinel, F. Gougnaud, M. Jacquemet, C. Madec, P.A.P. Nghiem, D. Uriot
CEA/IRFU, Gif-sur-Yvette, France
- P. Bertrand, M. Di Giacomo, R. Ferdinand, J.-M. Lagniel
GANIL, Caen, France
|
| Abstract |
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project). This paper presents to the accelerator community the status at August 2016 of the SARAF-LINAC Project.
|
| Paper |
download MOOP01.PDF [1.403 MB / 3 pages] |
| Slides |
download MOOP01_TALK.PDF [4.978 MB] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
LINAC2016, East Lansing, MI, USA |
| Series |
Linear Accelerator Conference (28th) |
| Proceedings |
Link to full LINAC2016 Proccedings |
| Session |
Oral Poster Session |
| Date |
26-Sep-16 15:00–16:00 |
| Main Classification |
2 Proton and Ion Accelerators and Applications |
| Sub Classification |
2B Ion Linac Projects |
| Keywords |
linac, cryomodule, status, rfq, solenoid |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Yoshishige Yamazaki (FRIB/MSU, East Lansing, MI, USA); Alberto Facco (FRIB/MSU, East Lansing, MI, USA); Amy McCausey (FRIB/MSU, East Lansing, MI, USA); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-169-4 |
| Published |
May 2017 |
| Copyright |
|