<?xml version="1.0" encoding="UTF-8"?>
<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Popov, K.</author>
             <author>Aryshev, A.</author>
             <author>Terunuma, N.</author>
             <author>Urakawa, J.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             KEK LUCX Facility Laser-to-RF&RF-to-RF Stability Study and Optimization
          </title>
       </titles>
       <publisher>JACoW Publishing</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>2673-5490</isbn>
		 <isbn>978-3-95450-227-1</isbn>
		 <electronic-resource-num>10.18429/JACoW-IPAC2022-TUPOPT066</electronic-resource-num>
		 <language>English</language>
		 <pages>1167-1170</pages>
       <keywords>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2022</year>
          <pub-dates>
             <date>2022-07</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-IPAC2022-TUPOPT066</url>
              <url>https://jacow.org/ipac2022/papers/tupopt066.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          KEK LUCX facility* is a linear accelerator devoted to the beam instrumentation R&amp;Ds for present and future accelerator systems and colliders including ILC. According to the ILC TDR**, it is necessary to achieve RF-gun Laser-to-RF&amp;RF-to-RF phase stability of 0.35°(RMS) and amplitude stability of 0.07%(RMS) with implementation of the Digital LLRF feedback based on commercially available FPGA board and digital trigger system. As the first step to achieve ILC stability level at KEK-LUCX facility, present Laser-to-RF&amp;RF-to-RF phase and amplitude jitters were measured using time- and frequency-domain techniques. After that, jitter influence on beam parameters after RF-gun and main solenoid magnet was simulated with ASTRA tracking code*** and results were cross-checked during LUCX facility beam operation. Finally, stable digital trigger system and digital LLRF feedback based on SINAP EVG&amp;EVR and RedPitaya SIGNALlab-250 modules were implemented. This report demonstrates the results of Laser-to-RF&amp;RF-to-RF phase and amplitude jitter measurements cross-checked with ASTRA simulation and real beam parameters measurements before and after LUCX facility stabilization.
       </abstract>
    </record>
  </records>
</xml>
