CEA-DRF-IRFUdownload RIS dataset for institute's DOIs
France
| DOI | Title |
|---|---|
| 10.18429/JACoW-IPAC2019-MOPMP001 | Optic Corrections for FCC-hh |
| 10.18429/JACoW-IPAC2019-MOPMP005 | Field Quality for the Hadron Option of Future Circular Collider |
| 10.18429/JACoW-IPAC2019-MOPTS003 | Superconducting LINAC Design Upgrade in View of the 100 MeV MYRRHA Phase I |
| 10.18429/JACoW-IPAC2019-MOPTS006 | Final Results of the SPIRAL2 Injector Commissioning |
| 10.18429/JACoW-IPAC2019-MOPTS007 | SARAF Equipped Cavity Test Stand (ECTS) at CEA |
| 10.18429/JACoW-IPAC2019-MOPTS008 | ESS RFQ: Construction Status and Power Couplers Qualification |
| 10.18429/JACoW-IPAC2019-TUPTS006 | Tests at High RF Power of the ESS Medium Beta Cryomodule Demonstrator |
| 10.18429/JACoW-IPAC2019-TUPTS007 | SPIRAL2 RFQ Bunch Length and Longitudinal Emittance Measurements. |
| 10.18429/JACoW-IPAC2019-WEPRB007 | RF Commissioning of the SPIRAL2 RFQ in CW Mode and Beyond Nominal Field |
| 10.18429/JACoW-IPAC2019-WEPRB010 | RF Power Test of the Rebuncher for Saraf-Linac |
| 10.18429/JACoW-IPAC2019-WEPTS010 | Beam Dynamics Errors Studies for the IFMIF-DONES SRF-LINAC |
| 10.18429/JACoW-IPAC2019-WEPTS118 | Results of CEA Tests of SARAF Couplers Prototypes |
| 10.18429/JACoW-IPAC2019-THPTS008 | Prospects of Additive Manufacturing for Accelerators |
| 10.18429/JACoW-IPAC2019-THPTS117 | Results of CEA Tests of SARAF Cavities Prototypes |