TY - CONF AU - Tamura, K. AU - Bizen, T. AU - Masaki, M. AU - Ohkuma, H. AU - Oishi, M. AU - Shoji, M. AU - Takahashi, S. AU - Taniuchi, Y. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - Feasibility Tests of a Vacuum System for SPring-8-II J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - For SPring-8-II, the major upgrade of SPring-8, a test half-cell including permanent/electro magnets and a vacuum system was constructed, and hardware feasibility tests have been performed since 2017. Features of the SPring-8-II vacuum system are 1) introduction of the concept of a stainless steel 12 m-long integral chamber (LIC) with a welded structure, and 2) adoption of ex-situ baking of the chamber. The 12 m LIC with a narrow aperture, flangeless structure and a minimum number of bellows was designed so that the vacuum system could be installed without interference with the magnets of a narrow bore diameter aligned on girders with a severe packing factor. For replacement of the existing system with a new one in a short black-out period, the 12 m LIC is planned to be moved into the accelerator tunnel with keeping ultra-high vacuum (UHV) by closing thin gate valves at both ends, after evacuation to UHV by ex-situ baking and NEG activation. This presentation will overview the vacuum system, mainly the 12 m LIC, developed for the test half-cell, and describe the vacuum performance and the result of the assembly test conducted with the permanent/electro magnets. PB - JACoW Publishing CP - Geneva, Switzerland SP - 1272 EP - 1275 KW - vacuum KW - photon KW - hardware KW - multipole KW - operation DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-TUPMP018 UR - http://jacow.org/ipac2019/papers/tupmp018.pdf ER - TY - CONF AU - Takano, S. AU - Akikawa, H. AU - Fukami, K. AU - Hamato, K. AU - Hara, T. AU - Inagaki, T. AU - Kataoka, J. AU - Kondo, C. AU - Kusano, K. AU - Masaki, M. AU - Ogata, K. AU - Oishi, M. AU - Saito, Y. AU - Sato, K. AU - Shoji, M. AU - Tamura, K. AU - Tanaka, H. AU - Taniuchi, T. AU - Watanabe, T. AU - Yanagida, K. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - Renovation of Off-Axis Beam Injection Scheme for Next-Generation Photon Sources J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - Photon sources are looking for performance upgrades by pursuing higher photon brilliance and coherence these years. The trend is pushing the lattice design to lower the beam emittance, which naturally results in the narrower dynamic aperture. One bottleneck in the upgrades is a beam injection system capable of accumulating required beam intensity and keeping top-up operations with such narrow apertures. Beam injection with a nonlinear kicker and transverse/longitudinal on-axis injections are now in the limelight. However, these techniques still need time to be put into practical use. We take an alternative approach for the SPring-8 upgrade, SPring-8-II, renovating the off-axis beam injection scheme to address the following requirements for the coming diffraction-limited storage rings (DLSRs): minimizing of both injection beam amplitude and perturbation to stored beam, and topping-up functionality. This presentation will overview the renewed off-axis beam injection scheme and report the development status of the following three key components: 1) permanent magnet based DC septum magnet, 2) in-vacuum pulse septum magnet, and 3) twin kickers driven by a single solid state pulser. PB - JACoW Publishing CP - Geneva, Switzerland SP - 2318 EP - 2321 KW - septum KW - injection KW - vacuum KW - kicker KW - photon DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-WEPMP009 UR - http://jacow.org/ipac2019/papers/wepmp009.pdf ER - TY - CONF AU - Fukui, T. AU - Hara, T. AU - Hasegawa, T. AU - Hosoda, N. AU - Inagaki, T. AU - Maesaka, H. AU - Matsubara, S. AU - Morimoto, O. AU - Ohshima, T. AU - Okada, K. AU - Tajiri, Y. AU - Tanaka, H. AU - Tanaka, S. AU - Yamaga, M. AU - Yoshioka, M. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - The Design of the Control System for the SACLA/SPring-8 Accelerator Complex to Use the LINAC of SACLA for a Full-Energy Injector of SPring-8 J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - At the SPring-8 site, the X-ray free electron laser facili-ty, SACLA, and the third-generation light source, SPring-8 storage ring, have been operated. On the SPring-8 up-grade project we have a plan to use the linac of SACLA as a full-energy injector of the storage ring. To achieve the SACLA’s user operation and the beam injection to the storage ring in parallel, it is necessary to control the beam energy and the peak current on a pulse by pulse. The demand for an injection occurs anytime during the top-up operation of the storage ring. For this purpose, two accel-erators should be controlled seamlessly and the SACLA has to provide the low emittance electron beam to gener-ate X-ray laser and to be an injector of the storage ring simultaneously. Because SACLA has to control the beam energy and peak current on a pulse by pulse, we are de-signing a system to meet these requirements. A master controller stores a pattern of parameters required for the low-level RF controllers. Each pattern consists of 60 rows which correspond to the parameters for one second with a beam repetition rate of the SACLA, 60Hz. The master sends the parameters to the controllers with reflective memory. We can select the pattern every second on de-mand and it is flexible enough for the top-up operation of the storage ring. Also the data of low-level RF and beam position monitor are stored into the database with a beam repetition rate. In this paper, we report the design of con-trol system for SACLA/SPring-8 to control the beam energy and the peak current on a pulse by pulse. PB - JACoW Publishing CP - Geneva, Switzerland SP - 2529 EP - 2531 KW - controls KW - database KW - operation KW - storage-ring KW - injection DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-WEPGW029 UR - http://jacow.org/ipac2019/papers/wepgw029.pdf ER - TY - CONF AU - Maesaka, H. AU - Fukui, T. AU - Hara, T. AU - Hasegawa, T. AU - Hosoda, N. AU - Inagaki, T. AU - Kondo, C. AU - Matsubara, S. AU - Morimoto, O. AU - Ohshima, T. AU - Okada, K. AU - Tajiri, Y. AU - Tanaka, H. AU - Tanaka, S. AU - Yamaga, M. AU - Yoshioka, M. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - On-Demand Beam Route and RF Parameter Switching System for Time-Sharing of a Linac for X-ray Free-Electron Laser as an Injector to a 4th-Generation Synchrotron Radiation Source J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - We have an upgrade plan of the SPring-8 storage ring to provide much more brilliant X-rays with a low-emittance electron beam. Since the upgraded ring requires a low-emittance injection beam, we are planning to timeshare the linac of the X-ray free electron laser (XFEL) facility, SACLA, as an injector for the upgraded ring. The SACLA linac delivers low-emittance and short-bunch electron beams to two XFEL beamlines with a 60 Hz repetition rate. The beam route is right now equally changed by a kicker magnet at a switchyard. The beam parameter is also optimized for each XFEL beamline by changing RF parameters pulse-by-pulse with simple software at this moment*. Since the number of beam injection shots to the storage ring is much less frequent than XFEL shots, one of the XFEL shots must be overridden by an injection with on-demand basis. In addition, the beam quality, such as 1 mm mrad normalized emittance, 10 fs bunch length and 10 kA peak current, must be maintained not to deteriorate the XFEL performance. Therefore, we have developed an on-demand beam route and RF parameter switching system with sufficient speed, precision and reliability. A beam route data is transmitted to each accelerator unit by a reflective memory network, and special software changes the parameters of each accelerator unit pulse-by-pulse according to the received data. We tested the on-demand switching system at a test bench and the SACLA linac. The beam parameters were appropriately controlled with a negligible failure rate. The user service of the beam injection from SACLA to SPring-8 is scheduled in 2020 and the on-demand switching system is almost ready for the time-sharing operation of multiple XFEL beamlines and a SPring-8 injection. PB - JACoW Publishing CP - Geneva, Switzerland SP - 3427 EP - 3430 KW - linac KW - FEL KW - electron KW - injection KW - controls DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-THYYPLS1 UR - http://jacow.org/ipac2019/papers/thyypls1.pdf ER - TY - CONF AU - Ohshima, T. AU - Hosoda, N. AU - Maesaka, H. AU - Matsubara, S. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - Timing Synchronization System for Beam Injection from the SACLA Linac to the SPring-8 Storage Ring J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - We developed a timing synchronization system for beam injections from the linac of the X-ray free-electron laser (XFEL), SACLA, to the current SPring-8 storage ring. This injection scheme is beneficial for the next upgraded ring, SPring-8-II, where low emittance injection beams is required. The developed timing system aims at synchronizing the timing between the RF frequencies of the two accelerators which do not have a common subharmonic frequency. An important point is to keep the high performance of the current timing system which provides stable XFEL operation at SACLA. For this purpose, we designed and constructed a MicroTCA.4 system comprised of a high-speed ADC and an RF front-end for the synchronization. The RF signal of SACLA is digitized by the ADC whose clock is synchronized to SPring-8. A digital down-converter in the FPGA on the ADC module gives the phase difference instantaneously and a feedback logic applies a frequency modulation (FM) to the master oscillator of SACLA so as to synchronize SACLA with SPring-8. A bench test result showed that the timing jitter between the two frequency at injection timing was 1.2 ps rms, which was sufficient for the required value of 3 ps rms for the beam injection to the ring. In this presentation, we report an overview of the synchronization system, details of the developed electronics and the system performance obtained by a beam injection experiment from SACLA to SPring-8. PB - JACoW Publishing CP - Geneva, Switzerland SP - 3882 EP - 3885 KW - timing KW - linac KW - injection KW - storage-ring KW - laser DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-THPRB034 UR - http://jacow.org/ipac2019/papers/thprb034.pdf ER - TY - CONF AU - Fukami, K. AU - Aoki, T. AU - Azumi, N. AU - Inoue, S.I. AU - Kai, T. AU - Kimura, H. AU - Kiuchi, J. AU - Matsubara, S. AU - Matsui, S. AU - Takano, S. AU - Taniuchi, T. AU - Watanabe, T. AU - Yanagida, K. AU - Zhang, C. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - Magnet Developments and Precise Alignment Schemes for SPring-8-II J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - The magnet lattice design of the SPring-8 upgrade, SPring-8-II, is a five bend achromat composed of one normal and four longitudinal gradient bending magnets. Permanent magnet has been chosen for both types of the dipoles, and the high gradient multipole magnets are all electromagnets. This presentation will overview the magnet developments and precise alignment schemes for SPring-8-II, focusing specifically on the following features. Temperature insensitive magnetic circuits with a function of fine magnetic field tuning have been developed for the permanent magnet dipoles. Narrow bore multipole magnets with compact coil assemblies have been designed. We optimized the shimming for enough good field regions, and minimized ohmic loss at the coils for suppressing thermal deformation. To improve the accuracy of vibrating wire magnet alignment, practical wire sag distributions have been quantitatively evaluated. In 2018, a test half-cell was constructed by which the feasibilities of the magnets and the overall alignment precisions including the effects of the thermal deformation of magnets, a repeatability of magnet reassembly has been confirmed. PB - JACoW Publishing CP - Geneva, Switzerland SP - 4158 EP - 4160 KW - alignment KW - multipole KW - lattice KW - sextupole KW - quadrupole DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-THPTS024 UR - http://jacow.org/ipac2019/papers/thpts024.pdf ER -