TY - CONF AU - Bisoffi, G. AU - Andreev, V. AU - Bellan, L. AU - Bellato, M.A. AU - Bermudez, J. AU - Bissiato, E. AU - Bortolato, D. AU - Chiurlotto, F. AU - Comunian, M. AU - Contran, T. AU - Facco, A. AU - Fagotti, E. AU - Francescon, P. AU - Friso, A. AU - Galatà, A. AU - Gallo, C.S. AU - Giacchini, M.G. AU - Lollo, M. AU - Martini, D. AU - Miglioranza, M.O. AU - Modanese, P. AU - Montis, M. AU - Munaron, E. AU - Nigrelli, G. AU - Pavinato, S. AU - Pengo, M. AU - Pisent, A. AU - Poggi, M. AU - Pranovi, L. AU - Rossignoli, M. AU - Scarpa, D. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - Hardware Commissioning of the Renovated PIAVE Injector at INFN-LNL J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - During 2018, the PIAVE superconducting linac injector at INFN-LNL, based on superconducting RFQs and two cryomodules with quarter wave resonators, underwent a renovation plan. This operation was strictly related to the one carried out on ALPI [1], which will become a post-accelerator for both stable and exotic beams in a near future. PIAVE Quarter Wave Resonator (QWR) cryomod-ules, in operation since 2006, were moved to ALPI to be used for the acceleration of both stable beams and future exotic beams delivered from the cyclotron target-ion-source station, after appropriate purification, charge breeding and pre-acceleration stages. In order to cope with the removal of the two QWR cryomodules in PIAVE, a newly designed 80 MHz room temperature buncher was designed, built and tested: the buncher is required so as to match the longitudinal phase space between PIAVE su-perconducting RFQs (SRFQ1 and SRFQ2) and ALPI. In the same period, substantial refurbishments on the ECR ion source platform were carried out, in particular on its infrastructure and safety equipment. A problem on an electronic component on SRFQ2, though quickly fixed, delayed beam commissioning of the PIAVE injector, which will start at the end of May 2019. PB - JACoW Publishing CP - Geneva, Switzerland SP - 949 EP - 952 KW - rfq KW - SRF KW - operation KW - MMI KW - ion-source DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-MOPTS042 UR - http://jacow.org/ipac2019/papers/mopts042.pdf ER - TY - CONF AU - Galatà, A. AU - Andreev, V. AU - Angot, J. AU - Bellan, L. AU - Bellato, M.A. AU - Bermudez, J. AU - Bisoffi, G. AU - Bondoux, D. AU - Bortolato, D. AU - Comunian, M. AU - Conte, A. AU - De Lazzari, M. AU - Francescon, P. AU - Gelain, F. AU - Marcato, D. AU - Miglioranza, M.O. AU - Moisio, M.F. AU - Munaron, E. AU - Pavinato, S. AU - Pedretti, D. AU - Pisent, A. AU - Roetta, M. AU - Roncolato, C.R. AU - Rossignoli, M. AU - Savarese, G. AU - Thuillier, T. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - Towards the First Beams from the ADIGE Injector for the SPES Project J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - The ADIGE (Acceleratore Di Ioni a Grande carica Esotici) injector of the SPES (Selective Production of Exotic Species) project is now in an advanced phase of installation. Its main components have been designed following particular needs of the project: first, an Electron Cyclotron Resonance (ECR)-based Charge Breeder (SPES-CB), to boost the charge states of the radioactive ions produced at SPES and allow their post-acceleration. Then, a stable 1+ source and a complete electrostatic beam line to characterize the SPES-CB. Finally, a unique Medium Resolution Mass Spectrometer (MRMS, R=1/1000), mounted on a high voltage platform downstream the SPES-CB, to clean the radioactive beam from the contaminants induced by the breeding stage. This contribution describes the status of the injector, in particular the installation of the platform housing the MRMS, the access and safety system adopted and the first beams to be extracted from the stable 1+ source. PB - JACoW Publishing CP - Geneva, Switzerland SP - 3647 EP - 3649 KW - plasma KW - ECR KW - injection KW - ion-source KW - instrumentation DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-THPGW030 UR - http://jacow.org/ipac2019/papers/thpgw030.pdf ER - TY - CONF AU - Bisoffi, G. AU - Bellan, L. AU - Bellato, M.A. AU - Bortolato, D. AU - Carletto, O. AU - Chiurlotto, F. AU - Comunian, M. AU - Conte, A. AU - Contran, T. AU - De Lazzari, M. AU - Fagotti, E. AU - Friso, A. AU - Giacchini, M.G. AU - Lollo, M. AU - Marcato, D. AU - Miglioranza, M.O. AU - Modanese, P. AU - Moisio, M.F. AU - Montis, M. AU - Munaron, E. AU - Nigrelli, G. AU - Pavinato, S. AU - Pengo, M. AU - Pisent, A. AU - Poggi, M. AU - Pranovi, L. AU - Roncolato, C.R. AU - Rossignoli, M. AU - Scarpa, D. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - Hardware Commissioning of the Refurbished Alpi LINAC at INFN-LNL to Serve as Spes Exotic Beam Accelerator J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - The ALPI linac at INFN-LNL was substantially refur-bished in 2018, especially in view of its use as secondary accelerator for exotic species in the framework of the SPES project. In particular: 10 magnetic triplets were replaced with higher gradient ones; two cryomodules with quarter wave resonator were moved from the PIAVE injector to ALPI, so as to make them available both for exotic and stable beams; the cryogenic plant was renovat-ed; the whole linac, its injector and its beam lines were eventually realigned via LASER tracking (LT). The ex-pected outcome of the refurbishment project is a larger beam transmission (crucial for the efficient transport of the unavoidably low current exotic beams) and improved overall reliability so as to further extend the lifetime of an already 25 years old machine. The hardware commission-ing of this new configuration will be reported. PB - JACoW Publishing CP - Geneva, Switzerland SP - 3650 EP - 3652 KW - linac KW - MMI KW - rfq KW - alignment KW - operation DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-THPGW031 UR - http://jacow.org/ipac2019/papers/thpgw031.pdf ER -