The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
| Title | CBETA Permanent Magnet Production Run | |
| Authors |
|
|
| Abstract | 214 neodymium permanent magnets have been manufactured for the return loop of the CBETA multi-turn ERL being built at Cornell University. There are 5 types of quadrupole and combined-function gradient magnets using a variant of the circular Halbach design. These are made out of NdFeB material and glued into an aluminium housing with water channels for temperature stabilisation. The NdFeB wedges and magnet construction were done by outside companies, while the final "tuning" using inserts containing 64 iron wires per magnet was done at BNL over a period of about 6 months. Average relative field errors of 2.3·10⁻⁴ were achieved on the beam region. The magnet strengths vary by type but are of order 10T/m for quadrupole component and up to 0.3T for the dipole. This paper reports on the field quality and timeline achieved in this production process. | |
| Paper | download THPTS088.PDF [1.311 MB / 4 pages] | |
| Export | download ※ BibTeX ※ LaTeX ※ Text/Word ※ RIS ※ EndNote | |
| Conference | IPAC2019 | |
| Series | International Particle Accelerator Conference (10th) | |
| Location | Melbourne, Australia | |
| Date | 19-24 May 2019 | |
| Publisher | JACoW Publishing, Geneva, Switzerland | |
| Editorial Board | Mark Boland (UoM, Saskatoon, SK, Canada); Hitoshi Tanaka (KEK, Tsukuba, Japan); David Button (ANSTO, Kirrawee, NSW, Australia); Rohan Dowd (ANSTO, Kirrawee, NSW, Australia); Volker RW Schaa (GSI, Darmstadt, Germany); Eugene Tan (ANSTO, Kirrawee, NSW, Australia) | |
| Online ISBN | 978-3-95450-208-0 | |
| Received | 11 April 2019 | |
| Accepted | 22 May 2019 | |
| Issue Date | 21 June 2019 | |
| DOI | doi:10.18429/JACoW-IPAC2019-THPTS088 | |
| Pages | 4318-4321 | |
| Copyright |
|