| DOI | Title |
|---|---|
| 10.18429/JACoW-IPAC2018-TUPAF012 | Commissioning of the Lipac Medium Energy Beam Transport Line |
| 10.18429/JACoW-IPAC2018-TUPAL015 | Progress in the Realization and Commissioning of the Exotic Beam Facility SPES at INFN-LNL |
| 10.18429/JACoW-IPAC2018-TUPAL037 | Installation Progress on FRIB β=0.041 Cryomodules Toward Beam Commissioning |
| 10.18429/JACoW-IPAC2018-WEXGBF3 | RF System for FRIB Accelerator |
| 10.18429/JACoW-IPAC2018-THXGBF2 | Beam Commissioning of the IFMIF EVEDA Very High Power RFQ |
| 10.18429/JACoW-IPAC2018-THPAK019 | Beam Dynamics of the First Beams for IFMIF-EVEDA RFQ Commissioning |
| 10.18429/JACoW-IPAC2018-THPAK021 | Design of High Resolution Mass Spectrometer for SPES |
| 10.18429/JACoW-IPAC2018-THPAK022 | Beam Dynamic Simulation for the Beam Line from Charge Breeder to ALPI for SPES Project |
| 10.18429/JACoW-IPAC2018-THPAL007 | Upgrade of PIAVE Superconducting RFQs at INFN-Legnaro |
| 10.18429/JACoW-IPAC2018-THPAL008 | A RFQ Cooler Development |