| DOI | Title |
|---|---|
| 10.18429/JACoW-IPAC2018-TUPAF088 | Final factory-side Measurements of the Next SC CH-Cavities for the HELIAC-Project |
| 10.18429/JACoW-IPAC2018-TUPAK002 | Advanced Approach for Beam Matching along the Multi-Cavity SC CW Linac at GSI |
| 10.18429/JACoW-IPAC2018-TUPAK003 | Beam Dynamics Simulations for the New Superconducting CW Heavy Ion LINAC at GSI |
| 10.18429/JACoW-IPAC2018-TUPAK004 | Superconducting CH-Cavity Heavy Ion Beam Testing at GSI |
| 10.18429/JACoW-IPAC2018-WEPAK006 | Bunch Shape Measurements at the GSI CW-Linac Prototype |
| 10.18429/JACoW-IPAC2018-WEPAL024 | High Precision Beam Parameter Stabilization for P2 at MESA |
| 10.18429/JACoW-IPAC2018-WEPML039 | Design of the Two-Gap Superconducting Re-Buncher |
| 10.18429/JACoW-IPAC2018-WEPML040 | Further Tests on the Final State of the SC 325 MHz CH-Cavity and Coupler Test Bench Update |
| 10.18429/JACoW-IPAC2018-WEPML041 | Comparative Study of Low Beta Multi-Gap Superconducting Bunchers |
| 10.18429/JACoW-IPAC2018-WEPML045 | Infrastructure for Superconducting CH-Cavity Preparation at HIM |
| 10.18429/JACoW-IPAC2018-WEPML046 | Multipactor Discharge in Superconducting Accelerating CH Cavities |
| 10.18429/JACoW-IPAC2018-THPMF062 | Smith-Purcell Radiation for Bunch Length Measurements at the Injection of MESA |