| DOI | Title |
|---|---|
| 10.18429/JACoW-IPAC2018-MOZGBE5 | Results on the FCC-hh Beam Screen at the KIT Electron Storage Ring KARA |
| 10.18429/JACoW-IPAC2018-TUPMK001 | Removal of RF-Fingers at the Edges of the Injection Kickers |
| 10.18429/JACoW-IPAC2018-TUPMK002 | First Tests of the Apple II Undulator for the LOREA Insertion Device and Front End |
| 10.18429/JACoW-IPAC2018-TUPML078 | Fast Quadrupole Beam Based Alignment Using AC Corrector Excitations |
| 10.18429/JACoW-IPAC2018-WEPMF001 | Upgrade of the ALBA Magnetic Laboratory for Measuring LIPAc HEBT Quadrupoles and Dipole |
| 10.18429/JACoW-IPAC2018-WEPMF002 | Operational Experience with IOTs at Alba Synchrotron |
| 10.18429/JACoW-IPAC2018-THPAL017 | From design to alignment of ThomX quadrupoles |
| 10.18429/JACoW-IPAC2018-THPMF002 | Studies for Injection with a Pulsed Multipole Kicker at ALBA |
| 10.18429/JACoW-IPAC2018-THPMF013 | The Stripline Kicker Prototype for the CLIC Damping Rings at ALBA: Installation, Commissioning and Beam Characterisation |