       <titles>
          <title>
             Commissioning of the ADS CW SRF Linac Demo
          </title>
       </titles>
		 <publisher>JACoW Publishing</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
       <abstract>
          The Chinese ADS project now is under key technology R&amp;D and a 25 MeV CW proton superconducting linac is under assembling in Lanzhou by collaboration between IMP in Lanzhou and IHEP in Beijing. The beam commissioning is scheduled in June-July 2017. Before assembling 25 MeV proton linac, IMP team built a 10 MeV proton superconducting linac based on 162.5 MHz HWR cavity technology, which successfully accelerated 9.55-10 MeV@1-2.7 mA CW proton beam in 2016, meanwhile, IHEP team built a 10 MeV proton superconducting linac based on 325 MHz Spoke cavity technology, which successfully accelerated 10 MeV@2.1 mA CW proton beam in 2016. This invited alk will present 1-5 mA CW proton beam commissioning results and lessons learned from the 10-25 MeV superconducting linac.
       </abstract>
    </record>
  </records>
</xml>