| Title |
The Status of the CSNS/RCS Power Supply System |
| Authors |
- X. Qi, Z. Hao, W. Zhang
IHEP, Beijing, People's Republic of China
|
| Abstract |
The 1.6GeV proton synchrotron proposed in the CSNS Project is a 25Hz rapid-cycling synchrotron (RCS) with injection energy of 80MeV. Beam power is aimed to 100kW at 1.6GeV. In this year, the neutron beam was successfully obtained for the first time. This paper will introduce the commission statues of RCS Power Supply System status in the last year.
|
| Paper |
download WEPML070.PDF [0.343 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2018, Vancouver, BC, Canada |
| Series |
International Particle Accelerator Conference (9th) |
| Proceedings |
Link to full IPAC2018 Proccedings |
| Session |
MC7 Poster Session |
| Date |
02-May-18 16:00–17:30 |
| Main Classification |
07 Accelerator Technology |
| Sub Classification |
T11 Power Supplies |
| Keywords |
power-supply, dipole, neutron, network, resonance |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Shane Koscielniak (TRIUMF, Vancouver, BC, Canada); Todd Satogata (JLab, Newport News, VA, USA); Volker RW Schaa (GSI, Darmstadt, Germany); Jana Thomson (TRIUMF, Vancouver, BC, Canada) |
| ISBN |
978-3-95450-184-7 |
| Published |
June 2018 |
| Copyright |
|