| Title |
Study on the Fixed Point Injection during the Beam Commissioning for CSNS |
| Authors |
- M.Y. Huang, H.C. Liu, S. Wang, S.Y. Xu
IHEP, Beijing, People's Republic of China
|
| Abstract |
In order to inject the H⁻ beam into the Rapid Cycling Synchrotron (RCS) of China Spallation Neutron Source (CSNS) accurately, different injection methods were used in different periods of beam commissioning for CSNS. In the early stage of beam commissioning, since the precise relative position of the injection beam and circular beam was unknown and the injection beam power was relatively small, the fixed point injection method was used. In this paper, the fixed point injection method is studied in detail and the beam commissioning results are given and discussed. In addition, a method to adjust the timing of the injection pulse power is presented and confirmed by the beam commissioning.
|
| Paper |
download TUPAL005.PDF [0.322 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2018, Vancouver, BC, Canada |
| Series |
International Particle Accelerator Conference (9th) |
| Proceedings |
Link to full IPAC2018 Proccedings |
| Session |
MC4 Poster Session |
| Date |
01-May-18 09:00–12:00 |
| Main Classification |
04 Hadron Accelerators |
| Sub Classification |
T12 Beam Injection/Extraction and Transport |
| Keywords |
injection, MMI, timing, neutron, proton |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Shane Koscielniak (TRIUMF, Vancouver, BC, Canada); Todd Satogata (JLab, Newport News, VA, USA); Volker RW Schaa (GSI, Darmstadt, Germany); Jana Thomson (TRIUMF, Vancouver, BC, Canada) |
| ISBN |
978-3-95450-184-7 |
| Published |
June 2018 |
| Copyright |
|