| Title |
The SARAF-LINAC Project 2018 Status |
| Authors |
- N. Pichoff, D. Chirpaz-Cerbatpresenter, R. Cubizolles, J. Dumas, R.D. Duperrier, G. Ferrand, B. Gastineau, P. Gastinel, F. Gougnaud, M. Jacquemet, C. Madec, Th. Plaisant, F. Senée, A. Sutra-Fourcade, D. Uriot
IRFU, CEA, University Paris-Saclay, Gif-sur-Yvette, France
- D. Berkovits, J. Luner, A. Perry, E. Reinfeld, J. Rodnizki
Soreq NRC, Yavne, Israel
- M. Di Giacomo
GANIL, Caen, France
|
| Abstract |
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the MEBT line and the superconducting linac (SARAF-LINAC Project). The prototypes of the 176 MHz NC rebuncher, SC cavities, RF coupler and SC Solenoid-Package are under construction and their test stands construction or adaptation is in progress at Saclay. Meanwhile, the cryomodules and the global system just passed their Critical Design Reviews. This paper presents the status of the SARAF-LINAC Project at April 2018.
|
| Paper |
download TUPAK015.PDF [1.836 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2018, Vancouver, BC, Canada |
| Series |
International Particle Accelerator Conference (9th) |
| Proceedings |
Link to full IPAC2018 Proccedings |
| Session |
MC4 Poster Session |
| Date |
01-May-18 09:00–12:00 |
| Main Classification |
04 Hadron Accelerators |
| Sub Classification |
A17 High Intensity Accelerators |
| Keywords |
linac, cryomodule, cavity, status, controls |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Shane Koscielniak (TRIUMF, Vancouver, BC, Canada); Todd Satogata (JLab, Newport News, VA, USA); Volker RW Schaa (GSI, Darmstadt, Germany); Jana Thomson (TRIUMF, Vancouver, BC, Canada) |
| ISBN |
978-3-95450-184-7 |
| Published |
June 2018 |
| Copyright |
|