| Title |
Upgrade Plan of J-PARC MR - Toward 1.3 MW Beam Power |
| Authors |
- T. Koseki
KEK, Ibaraki, Japan
|
| Abstract |
The Main Ring Synchrotron (MR), a 30-GeV slow cycling proton synchrotron, delivers intense proton beam to a long-baseline neutrino oscillation experiment, T2K, by fast extraction and to an experimental facility, which is called hadron hall by slow extraction. The achieved beam intensities for routine operations are 470 kW ( 2.4 x 10¹⁴ ppp) for the fast extraction and 44 kW ( 5.1 x 10¹³ ppp) for the slow extraction. In order to increase the beam intensity, a plan to replace the magnet power supplies are now in progress for operation with a higher repetition rate. After the replacement, the cycle time will be shortened about a half and increase beam intensities two times larger for the fast extraction. In addition, a further upgrade plan for the fast extraction is mainly reinforcement of rf power supplies. The goal of the upgrade plan is reaching 1.3 MW beam power for the neutrino experiment.
|
| Paper |
download TUPAK005.PDF [1.278 MB / 4 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2018, Vancouver, BC, Canada |
| Series |
International Particle Accelerator Conference (9th) |
| Proceedings |
Link to full IPAC2018 Proccedings |
| Session |
MC4 Poster Session |
| Date |
01-May-18 09:00–12:00 |
| Main Classification |
04 Hadron Accelerators |
| Sub Classification |
A04 Circular Accelerators |
| Keywords |
operation, experiment, injection, proton, cavity |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Shane Koscielniak (TRIUMF, Vancouver, BC, Canada); Todd Satogata (JLab, Newport News, VA, USA); Volker RW Schaa (GSI, Darmstadt, Germany); Jana Thomson (TRIUMF, Vancouver, BC, Canada) |
| ISBN |
978-3-95450-184-7 |
| Published |
June 2018 |
| Copyright |
|