| Title |
Preparation Towards the Ess Linac Ion Source and Lebt Beam Commissioning on Ess Site |
| Authors |
- R. Miyamoto, M. Eshraqi, A. Jansson, E. Laface, Y. Levinsen, Ø. Midttun, N. Milas, M. Muñoz, D.C. Plostinar, A. Ponton, E. Sargsyan, L. Tchelidze
ESS, Lund, Sweden
- L. Celona, L. Neri
INFN/LNS, Catania, Italy
- W. Ledda
Vitrociset s.p.a, Roma, Italy
|
| Abstract |
Beam commissioning of the proton linac of the European Spallation Source begin in summer, 2018, from the ion source (IS) and low energy beam transport (LEBT), and continues in stages until 2022, when the first beam is sent to its spallation target. This paper presents the plan, status, and highlights of preparation works for the upcoming IS and LEBT beam commissioning.
|
| Paper |
download TUPAF064.PDF [1.503 MB / 4 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2018, Vancouver, BC, Canada |
| Series |
International Particle Accelerator Conference (9th) |
| Proceedings |
Link to full IPAC2018 Proccedings |
| Session |
MC4 Poster Session |
| Date |
01-May-18 09:00–12:00 |
| Main Classification |
04 Hadron Accelerators |
| Sub Classification |
A08 Linear Accelerators |
| Keywords |
MMI, rfq, linac, solenoid, site |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Shane Koscielniak (TRIUMF, Vancouver, BC, Canada); Todd Satogata (JLab, Newport News, VA, USA); Volker RW Schaa (GSI, Darmstadt, Germany); Jana Thomson (TRIUMF, Vancouver, BC, Canada) |
| ISBN |
978-3-95450-184-7 |
| Published |
June 2018 |
| Copyright |
|