| Title |
Status of High Efficiency Klystron Development in TETD |
| Authors |
- Y. Okubo, S. Fujii, K. Suzuki, T.E. Tanaka
Toshiba Electron Tubes & Devices Co., Ltd (TETD), Tochigi, Japan
|
| Abstract |
TETD (Toshiba Electron Tubes and Devices Co., Ltd.) has been developing a high efficiency klystron improved bunch quality by the multi-stage of core oscillation design. For feasibility study, an S-band 7.5 MW klystron has been designed with the efficiency of more than 60% at 1.8μperveance. The first prototype was fabricated by modifying the interaction section of a commercial model to enhance the efficiency from 45% to 60%. The klystron was tested in June 2017, and 57% of efficiency at 6 MW output power was demonstrated. We are developing the second prototype which has the improved design for the higher efficiency at 7.5 WM output power. The design details and the test results of the first prototypes are presented.
|
| Paper |
download THPAL148.PDF [0.678 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2018, Vancouver, BC, Canada |
| Series |
International Particle Accelerator Conference (9th) |
| Proceedings |
Link to full IPAC2018 Proccedings |
| Session |
MC7 Poster Session |
| Date |
03-May-18 09:00–12:00 |
| Main Classification |
07 Accelerator Technology |
| Sub Classification |
T08 RF Power Sources |
| Keywords |
klystron, cavity, electron, simulation, bunching |
| Publisher |
JACoW Publishing, Geneva, Switzerland |
| Editors |
Shane Koscielniak (TRIUMF, Vancouver, BC, Canada); Todd Satogata (JLab, Newport News, VA, USA); Volker RW Schaa (GSI, Darmstadt, Germany); Jana Thomson (TRIUMF, Vancouver, BC, Canada) |
| ISBN |
978-3-95450-184-7 |
| Published |
June 2018 |
| Copyright |
|