JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


https://doi.org/10.18429/JACoW-IPAC2018-THPAF019
Title Initial Performance of the Magnet System in the Splitter/Combiner Section of the Cornell-Brookhaven Energy-Recovery Linac Test Accelerator
Authors
  • J.A. Crittenden, A.C. Bartnik, R.M. Bass, D.C. Burke, J. Dobbins, C.M. Gulliford, Y. Li, D. Sagan, K.W. Smolenski, Turco, J. Turco
    Cornell University (CLASSE), Cornell Laboratory for Accelerator-Based Sciences and Education, Ithaca, New York, USA
  • J.S. Berg
    BNL, Upton, Long Island, New York, USA
  • D. Jusic
    Cornell University, Ithaca, New York, USA
Abstract The Cornell-Brookhaven Energy-recovery Linac Test Accelerator is a four-pass, 150-MeV electron accelerator with a six-cell 1.3 GHz superconducting-RF linear accelerator and a fixed-field alternating-gradient (FFAG) return loop made up of Halbach-style quadrupole magnets. The optics matching between the linear accelerator and the return loop is achieved with a conventional magnet system comprised of 50 dipole magnets and 64 quadrupole magnets in four beamlines at each end of the linac. The 42-, 78-, 114- and 150-MeV electron beams are separated into independent vacuum chambers in order to allow for the path-length adjustment required by energy recovery. We report on the first beam tests of the initial installation of the splitter/combiner section at the exit of the linac. The vacuum system of the 42-MeV S1 line was installed during the first week of April. Nine dipole and four quadrupole magnets were installed and surveyed into position the following week, and the water cooling system was commissioned. A 6-MeV beam passed through the line on April~11 with no need for adjusting pre-set magnet excitation currents. One week later, time-of-flight measurements were used to calibrate and phase the individual superconducting RF cavities. The S1 magnet settings were then scaled up to achieve 5-cavity, 42-MeV operation through the first nine FFAG permanent-magnet quadrupoles. This initial Fractional Arc Test will conclude on May 18, when the installation of the remaining seven splitter/combiner lines and the return loop will begin. CBETA operations are scheduled to begin in early 2019.
Funding This work is supported by NSF award DMR-0807731, DOE grant DE-AC02- 76SF00515, and New York State Energy Research and Development Authority.
Paper download THPAF019.PDF [8.367 MB / 4 pages]
Export download ※ BibTeX LaTeXText/WordRISEndNote
Conference IPAC2018, Vancouver, BC, Canada
Series International Particle Accelerator Conference (9th)
Proceedings Link to full IPAC2018 Proccedings
Session MC5 Poster Session
Date 03-May-18   09:00–12:00
Main Classification 05 Beam Dynamics and EM Fields
Sub Classification D01 Beam Optics - Lattices, Correction Schemes, Transport
Keywords linac, quadrupole, dipole, cavity, optics
Publisher JACoW Publishing, Geneva, Switzerland
Editors Shane Koscielniak (TRIUMF, Vancouver, BC, Canada); Todd Satogata (JLab, Newport News, VA, USA); Volker RW Schaa (GSI, Darmstadt, Germany); Jana Thomson (TRIUMF, Vancouver, BC, Canada)
ISBN 978-3-95450-184-7
Published June 2018
Copyright
Copyright © 2018 by JACoW, Geneva, Switzerland     CC-BY Creative Commons License
cc Creative Commons Attribution 3.0