04 Hadron Accelerators
A13 Cyclotrons
Paper Title Page
TUPVA113 The Feature of Magnetic Field Formation of Multi-Purpose Isochronous Cyclotron DC280 2352
 
  • I.A. Ivanenko, B. Gikal, G.G. Gulbekyan
    JINR, Dubna, Moscow Region, Russia
  • V.P. Kukhtin, E.A. Lamzin, S.E. Sytchevsky
    NIIEFA, St. Petersburg, Russia
 
  At the present time the activities on creation of the new heavy-ion isochronous cyclotron DC280 are carried out at Joint Institute for Nuclear Research. The isochronous cyclotron DC-280 will produce accelerated beam of ions A/Z= 4 - 7 with a smooth variation of the beam energy W= 4 ' 8 MeV/n. The variation of energy is provided by the wide range of the magnetic field levels from 0.64T till 1.32T and usage of the 11 radial and 4 pairs of harmonic correcting coils. In the work the results of calculations and final measurements of the magnetic field are presented. The magnetic field of cyclotron DC-280 is formed in a good conformity with results of computer modeling.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA113  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPVA129 Energy Efficiency and Saving Potential Analysis of the High Intensity Proton Accelerator HIPA at PSI 2399
 
  • A. Kovach, J. Grillenberger, A.S. Parfenova, M. Seidel
    PSI, Villigen PSI, Switzerland
 
  High power proton machines consume a large amount of energy. Thus, the energy efficiency of grid to beam power conversion is particularly important for the overall power consumption of such facilities. In this study, we analyse the energy efficiency of PSI's cyclotron-based HIPA facility, which presently delivers a maximum of 1.4 MW beam power. The total power consumption of the entire facility is 12.5 MW at 2.2 mA beam current (1.3 MW). Main power consumers are: RF systems, electromagnets, water cooling and auxiliary systems including infrastructure, each consuming 5.3 MW, 3.6 MW, 1.65 MW and 1.95 MW, respectively. HIPA's grid to beam efficiency is 18.3% when considering only those parts of any subsystems (RF components, magnets, cooling, and auxiliary systems), which are minimally required to produce a full 1.3 MW beam. The dependency of individual subsystems on beam power was also studied. These findings serve as a basis for further optimizations of the HIPA facility and give a reference of the efficiency estimate for the cyclotron-based high power machines.
* https://www.psi.ch/enefficient/
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA129  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)