| Title |
Commissioning Status of SuperKEKB Main Ring Magnet System |
| Authors |
- M. Masuzawa, T. Adachi, K. Egawa, T. Kawamoto, S. Nakamura, Y. Ohsawa, T. Okipresenter, R. Sugahara, R. Ueki
KEK, Ibaraki, Japan
|
| Abstract |
SuperKEKB is an electron-positron collider, which aims for the very high peak luminosity of 8x10³⁵ cm⁻²s⁻¹ , 40 times higher than that of KEKB. The SuperKEKB Main Ring (MR) system is very large, consisting of more than 1700 water-cooled normal-conducting magnets and about 900 air-cooled normal-conducting magnets. More than 400 magnets and power supplies were newly fabricated, tested and installed for SuperKEKB Phase I beam operation. The MR magnet system worked well, which contributed greatly to the smooth start-up of the MR. Commissioning status of the MR magnet system during SuperKEKB Phase I operation will be reported. Some problems resulting in beam abort will also be reported.
|
| Paper |
download WEPIK010.PDF [1.074 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2017, Copenhagen, Denmark |
| Series |
International Particle Accelerator Conference (8th) |
| Proceedings |
Link to full IPAC2017 Proccedings |
| Session |
Posters Wednesday 2 |
| Date |
17-May-17 16:00–18:00 |
| Main Classification |
01 Circular and Linear Colliders |
| Sub Classification |
A02 Lepton Colliders |
| Keywords |
operation, power-supply, dipole, interaction-region, luminosity |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Volker RW Schaa (GSI, Darmstadt, Germany); Gianluigi Arduini (CERN, Geneva, Switzerland); Juliana Pranke (ESS, Lund, Sweden); Mike Seidel (PSI, Villigen, Switzerland); Mats Lindroos (ESS, Lund, Sweden) |
| ISBN |
978-3-95450-182-3 |
| Published |
May 2017 |
| Copyright |
|