| Title |
Construction of the MYRRHA Injector |
| Authors |
- D. Mäder, H. Höltermann, H. Hähnel, D. Koser, K. Kümpel, U. Ratzinger, W. Schweizer
BEVATECH, Frankfurt, Germany
- C. Angulo, J. Belmans, L. Medeiros Romão, D. Vandeplassche
Studiecentrum voor Kernenergie - Centre d'Étude de l'énergie Nucléaire (SCK•CEN), Mol, Belgium
- M. Busch, H. Podlech
IAP, Frankfurt am Main, Germany
|
| Abstract |
A collaboration of SCK•CEN, IAP and BEVATECH GmbH is currently constructing the room temperature CH section of the 16.6 MeV CW proton injector for the MYRRHA project. The elaboration of all the construction readiness files for the construction of the accelerating cavities of the first CH section (1.5 to 5.9 MeV) is ongoing. In parallel, the planning, development and fabrication of all further components of this accelerator section is in progress, while the full study for the remaining section is under preparation. This contribution is documenting the most recent status.
|
| Paper |
download TUPVA062.PDF [0.889 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2017, Copenhagen, Denmark |
| Series |
International Particle Accelerator Conference (8th) |
| Proceedings |
Link to full IPAC2017 Proccedings |
| Session |
Posters Tuesday 3 |
| Date |
16-May-17 16:00–18:00 |
| Main Classification |
04 Hadron Accelerators |
| Sub Classification |
A08 Linear Accelerators |
| Keywords |
quadrupole, cavity, diagnostics, beam-diagnostic, linac |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Volker RW Schaa (GSI, Darmstadt, Germany); Gianluigi Arduini (CERN, Geneva, Switzerland); Juliana Pranke (ESS, Lund, Sweden); Mike Seidel (PSI, Villigen, Switzerland); Mats Lindroos (ESS, Lund, Sweden) |
| ISBN |
978-3-95450-182-3 |
| Published |
May 2017 |
| Copyright |
|