| Title |
NSLS-II Accelerator Commissioning and Transition to Operations |
| Authors |
- T.V. Shaftan
BNL, Upton, Long Island, New York, USA
|
| Abstract |
Over past year NSLS-II has completed accelerator commissioning and enabled operations of first project beam lines. Recently we further optimized the NSLS-II accelerators, increased the beam current to 400 mA without- and to 250 mA with Insertion Devices (IDs), commissioned top-off mode of operations and stabilized beam orbit to below 10% of the beam size in the source points. In this paper we report progress on the NSLS-II accelerator commissioning and operations and plans for future facility developments.
|
| Paper |
download WEPOY055.PDF [0.497 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2016, Busan, Korea |
| Series |
International Particle Accelerator Conference (7th) |
| Proceedings |
Link to full IPAC2016 Proccedings |
| Session |
Poster Session |
| Date |
11-May-16 16:00–18:00 |
| Main Classification |
02 Photon Sources and Electron Accelerators |
| Sub Classification |
A05 Synchrotron Radiation Facilities |
| Keywords |
operation, lattice, storage-ring, vacuum, injection |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Dong Eon Kim (PAL, Pohang, Republic of Korea); Kyung Sook Kim (PAL, Pohang, Republic of Korea); In Soo Ko (POSTECH, Pohang, Republic of Korea); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-147-2 |
| Published |
June 2016 |
| Copyright |
|