| Title |
Commissioning of the China-ADS Injector-I Testing Facility |
| Authors |
- F. Yan, J.S. Cao, Y.L. Chi, R. Ge, H. Geng, S. Gu, D.Z. Guo, T.M. Huang, X. Jing, H. Li, R.L. Liu, F. Long, C. Meng, H.F. Ouyang, W.M. Pan, Q.L. Peng, Y.F. Sui, J.L. Wang, S.C. Wang, Z. Xue, Q. Ye, Y.L. Zhao
IHEP, Beijing, People's Republic of China
|
| Abstract |
The 10 MeV accelerator-driven subcritical system (ADS) Injector I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at 325 MHz], for the ADS project in China. The ion source was installed since April of 2014, periods of commissioning are regularly scheduled between installation phases of the rest of the injector. 6.05 MeV proton energy has been achieved with average beam current of 10 mA by 7 SC spoke cavities at present. This contribution reports the details of the commissioning results together with the challenges of the CW machine commissioning.
|
| Paper |
download WEOBA02.PDF [0.880 MB / 4 pages] |
| Slides |
download WEOBA02_TALK.PDF [5.243 MB] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2016, Busan, Korea |
| Series |
International Particle Accelerator Conference (7th) |
| Proceedings |
Link to full IPAC2016 Proccedings |
| Session |
Contributed Oral Presentations, Hadron Accelerators |
| Date |
11-May-16 11:30–12:30 |
| Main Classification |
04 Hadron Accelerators |
| Sub Classification |
A08 Linear Accelerators |
| Keywords |
rfq, emittance, simulation, proton, cavity |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Dong Eon Kim (PAL, Pohang, Republic of Korea); Kyung Sook Kim (PAL, Pohang, Republic of Korea); In Soo Ko (POSTECH, Pohang, Republic of Korea); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-147-2 |
| Published |
June 2016 |
| Copyright |
|