| Title |
Commisioning of Facility for Assembling and Tests of Superconducting Magnets |
| Authors |
- S.A. Kostromin, V.V. Borisov, A.M. Donyagin, A.R. Galimov, O. Golubitsky, H.G. Khodzhibagiyan, S.A. Korovkin, G.L. Kuznetsov, D. Nikiforov, A.Y. Starikov, A. Tikhomirov
JINR, Dubna, Moscow Region, Russia
- A.V. Kudashkin, T.E. Serochkina, A.V. Shemchuk
JINR/VBLHEP, Dubna, Moscow region, Russia
|
| Abstract |
The NICA accelerator complex will consist of two injector chains, the new 600 MeV/u superconducting (SC) booster synchrotron, the existing SC synchrotron Nuclotron, and the new SC collider having two rings each of 503 m in circumference. The building construction of the new test facility for simultaneous cryogenic testing of the SC magnets on 6 benches is completed at the Laboratory of High Energy Physics. Premises with an area of 2600 m2 were prepared, equipment for magnets assembly and tests are installed. Three helium satellite refrigerators with each capacity of 100 W were commissioned 2 of 6 test benches for magnets testing are assembled and commissioned. NICA booster magnets fist cryogenic tests are done. The results are discussed.
|
| Paper |
download TUPMB051.PDF [1.404 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2016, Busan, Korea |
| Series |
International Particle Accelerator Conference (7th) |
| Proceedings |
Link to full IPAC2016 Proccedings |
| Session |
Poster Session |
| Date |
10-May-16 16:00–18:00 |
| Main Classification |
07 Accelerator Technology |
| Sub Classification |
T10 Superconducting Magnets |
| Keywords |
booster, dipole, collider, quadrupole, synchrotron |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Dong Eon Kim (PAL, Pohang, Republic of Korea); Kyung Sook Kim (PAL, Pohang, Republic of Korea); In Soo Ko (POSTECH, Pohang, Republic of Korea); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-147-2 |
| Published |
June 2016 |
| Copyright |
|