| Title |
First Commissioning of the SuperKEKB Vacuum System |
| Authors |
- Y. Suetsugu, H. Hisamatsu, T. Ishibashi, K. Kanazawa, K. Shibata, M. Shirai, S. Terui
KEK, Ibaraki, Japan
|
| Abstract |
The SuperKEKB, an electron-positron collider with asymmetric energies in KEK, has started the first commissioning with beams this year. One of major tasks in the commissioning is the beam scrubbing of new beam pipes in order to increase the beam lifetime and to decrease the background noise of the particle detector in the coming physics run. The temperatures and the vacuum pressures of new vacuum components, such as the bellows chambers, gate valves and the beam collimators, should be checked in this run. The decrease rate in the vacuum pressure are measured to estimate the vacuum scrubbing effect. Reported here will be the results obtained during the first commissioning and the present status of the vacuum system.
|
| Paper |
download TUOCB01.PDF [1.547 MB / 3 pages] |
| Slides |
download TUOCB01_TALK.PDF [2.526 MB] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2016, Busan, Korea |
| Series |
International Particle Accelerator Conference (7th) |
| Proceedings |
Link to full IPAC2016 Proccedings |
| Session |
Contributed Oral Presentations, Accelerator Technology |
| Date |
10-May-16 15:00–16:00 |
| Main Classification |
07 Accelerator Technology |
| Sub Classification |
T14 Vacuum Technology |
| Keywords |
vacuum, electron, photon, status, positron |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Dong Eon Kim (PAL, Pohang, Republic of Korea); Kyung Sook Kim (PAL, Pohang, Republic of Korea); In Soo Ko (POSTECH, Pohang, Republic of Korea); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-147-2 |
| Published |
June 2016 |
| Copyright |
|