| Title |
Implementation of a New Ramp Computation Scheme for the Magnet Power Supplies at ELSA |
| Authors |
- D. Proft, W. Hillertpresenter
ELSA, Bonn, Germany
|
| Abstract |
At the ELSA electron stretcher facility new power supply control units have been commissioned. These require a new software interface for set-point calculation based on the accelerator and timing model. Goal of the new scheme is a strict separation of the bidirectional ramp computation into an accelerator model dependent, a magnet dependent and a power supply dependent part. This introduces possible calibration/correction factors on each layer, thus allowing easy component replacement of the power supplies, the control units or even the magnets without the need for recalibration of the whole chain. In this contribution we will provide insights into the implementation of the new modeling scheme.
|
| Paper |
download THPOY001.PDF [0.633 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2016, Busan, Korea |
| Series |
International Particle Accelerator Conference (7th) |
| Proceedings |
Link to full IPAC2016 Proccedings |
| Session |
Poster Session |
| Date |
12-May-16 16:00–18:00 |
| Main Classification |
06 Beam Instrumentation, Controls, Feedback and Operational Aspects |
| Sub Classification |
T04 Accelerator/Storage Ring Control Systems |
| Keywords |
controls, power-supply, electron, extraction, injection |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Dong Eon Kim (PAL, Pohang, Republic of Korea); Kyung Sook Kim (PAL, Pohang, Republic of Korea); In Soo Ko (POSTECH, Pohang, Republic of Korea); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-147-2 |
| Published |
June 2016 |
| Copyright |
|