| Title |
Measurements using Button BPM SUM Signal |
| Authors |
- W.X. Cheng, K. Ha, J. Mead, O. Singh, G.M. Wang
BNL, Upton, Long Island, New York, USA
|
| Abstract |
Modern digital BPM detectors measure not only the beam positions, four buttons SUM signal can be very helpful for machine developments and operations. At NSLS-II, BPM SUM signal has been used from commissioning stage, to investigate localized beam losses. During top-off operation, precise beam lifetime measurement within relative short period of time becomes important. With many BPMs along the ring, BPM SUM can be a much more accurate tool to measure the beam current and lifetime. BPM SUM signal shall be proportional to beam current, and it may depends on button sizes and BPM chamber geometry, cable attenuations, electronics attenuations, beam position, bunch lengths, fill pattern etc. Experience of BPM SUM signals measurements will be presented.
|
| Paper |
download MOPMR057.PDF [0.496 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2016, Busan, Korea |
| Series |
International Particle Accelerator Conference (7th) |
| Proceedings |
Link to full IPAC2016 Proccedings |
| Session |
Poster Session |
| Date |
09-May-16 16:00–18:00 |
| Main Classification |
06 Beam Instrumentation, Controls, Feedback and Operational Aspects |
| Sub Classification |
T03 Beam Diagnostics and Instrumentation |
| Keywords |
electronics, storage-ring, operation, beam-losses, insertion |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Christine Petit-Jean-Genaz (CERN, Geneva, Switzerland); Dong Eon Kim (PAL, Pohang, Republic of Korea); Kyung Sook Kim (PAL, Pohang, Republic of Korea); In Soo Ko (POSTECH, Pohang, Republic of Korea); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-147-2 |
| Published |
June 2016 |
| Copyright |
|