Yang, Rui
TUPCO24
Design and Programming of a Multifunctional Device for Accelerator Beam Profile Measurement and Beam Stop
413
During the pre-research phase of China Spallation Neutron Source (CSNS) upgrade project (CSNS-II), in order to conduct beam commissioning of the Radio Frequency Quadrupole (RFQ) under high-intensity beam conditions, The structure of the last-stage wire scanner of the Medium Energy Beam Transport (MEBT) was innovatively modified. This modification not only added a Beam Stop but also significantly enhanced the efficiency of wire scanner. This paper presents the architecture and operational programming of a novel multifunctional device designed for accelerator beam diagnostics and beam termination: beam profile measurement via advanced sensing mechanisms and Beam Stop using a braided carbon fiber plate as the primary beam stop.
Paper: TUPCO24
DOI: reference for this paper: 10.18429/JACoW-IBIC2025-TUPCO24
About: Received: 03 Sep 2025 — Revised: 09 Sep 2025 — Accepted: 10 Sep 2025 — Issue date: 20 Jan 2026
WEPCO12
Development of a rectangular diagonal cut-plane BPM for the CSNS-II injection upgrade
645
As part of the CSNS-II upgrade, an improved injection scheme will be implemented to mitigate the space charge effect. To precisely measure the transverse beam position during injection, painting, and storage in the Rapid Cycling Synchrotron (RCS), a large-aperture (260 mm × 180 mm) Beam Position Monitor (BPM) is essential. The rectangular cut-plane BPM was selected for its excellent linearity over a large area and high signal-to-noise ratio (SNR). Due to limited space in the injection section, the BPMs must be integrated into the AC steering magnet. To prevent thermal heating from eddy current flow, a rib structure has been incorporated into the BPM's outer body. The BPM was designed using numerical simulation codes and subsequently manufactured. This paper details the simulation, design, and calibration results of the diagonal cut-plane BPM.
Paper: WEPCO12
DOI: reference for this paper: 10.18429/JACoW-IBIC2025-WEPCO12
About: Received: 03 Sep 2025 — Revised: 08 Sep 2025 — Accepted: 10 Sep 2025 — Issue date: 20 Jan 2026