<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Guidoboni, G.</author>
             <author>Allica, J.C.A.</author>
             <author>Bracco, C.</author>
             <author>Burger, S.</author>
             <author>Focker, G.J.</author>
             <author>Mikulec, B.</author>
             <author>Navarro Fernandez, A.</author>
             <author>Roncarolo, F.</author>
             <author>Søby, L.</author>
             <author>Zamantzas, C.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
          </title>
       </titles>
		 <publisher>JACoW</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>978-3-95450-192-2</isbn>
		 <electronic-resource-num>10.18429/JACoW-IBIC2017-MOPWC07</electronic-resource-num>
		 <language>English</language>
		 <pages>117-120</pages>
       <pages>MOPWC07</pages>
       <keywords>
          <keyword>ion</keyword>
          <keyword>linac</keyword>
          <keyword>MMI</keyword>
          <keyword>instrumentation</keyword>
          <keyword>injection</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2018</year>
          <pub-dates>
             <date>2018-03</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-IBIC2017-MOPWC07</url>
              <url>http://jacow.org/ibic2017/papers/mopwc07.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for the PSB composed essentially of a chicane and a stripping foil system. The equivalent of half of this new injection chicane, so-called Half-Sector Test (HST), was tempo-rarily installed in the Linac4 transfer line to evaluate the performance of the novel beam instrumentation, such as, stripping foils, monitoring screens, beam cur-rent transformers, H⁰/H⁻ monitor and dump, beam loss monitors, and beam position monitors. The results of the instrumentation commissioning of the HST are presented in this paper.
       </abstract>
    </record>
  </records>
</xml>
