<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Watkins, H.A.</author>
             <author>Baros, D.</author>
             <author>Martinez, D.</author>
             <author>Rybarcyk, L.</author>
             <author>Sedillo, J.D.</author>
             <author>Valicenti, R.A.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             Upgrades to the LANSCE Isotope Production Facilities Beam Diagnostics
          </title>
       </titles>
		 <publisher>JACoW</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>978-3-95450-177-9</isbn>
		 <electronic-resource-num>10.18429/JACoW-IBIC2016-WEPG31</electronic-resource-num>
		 <language>English</language>
		 <pages>691-694</pages>
       <pages>WEPG31</pages>
       <keywords>
          <keyword>electronics</keyword>
          <keyword>diagnostics</keyword>
          <keyword>isotope-production</keyword>
          <keyword>data-acquisition</keyword>
          <keyword>target</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2017</year>
          <pub-dates>
             <date>2017-02</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>http://dx.doi.org/10.18429/JACoW-IBIC2016-WEPG31</url>
              <url>http://jacow.org/ibic2016/papers/wepg31.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          The Los Alamos Neutron Science Center (LANSCE) is currently upgrading the beam diagnostics capability for the Isotope Production Facility (IPF) as part of an Accelerator Improvement Project (AIP). Improvements to measurements of: beam profile, beam energy, beam current and collimator charge are under development. Upgrades include high density harps, emittance slits, wire-scanners, multi-segment adjustable collimator, data acquisition electronics and motion control electronics. These devices will be installed and commissioned for the 2017 run cycle. Details of the hardware design and system development are presented.
       </abstract>
    </record>
  </records>
</xml>
