| Title |
Beam Position Monitors for LEReC |
| Authors |
- Z. Sorrell, P. Cerniglia, R.L. Hulsart, K. Mernick, R.J. Michnoff
BNL, Upton, Long Island, New York, USA
|
| Abstract |
The operating parameters for Brookhaven National Laboratory's Low Energy RHIC Electron Cooling (LEReC) project create a unique challenge. To ensure proper beam trajectories for cooling, the relative position between the electron and the ion beam needs to be known to within 50μm. In addition, time of flight needs to be provided for electron beam energy measurement. Various issues have become apparent as testing has progressed, such as mismatches in cable impedance and drifts due to temperature sensitivity. This paper will explore the difficulties related to achieving the level of accuracy required for this system, as well as the potential solutions for these problems.
|
| Funding |
Work supported by Brookhaven Science Associates, LL C under Contract No. DE-AC02-98CH10886 with the U.S. Dept. of Energy |
| Paper |
download MOPG08.PDF [0.317 MB / 4 pages] |
| Poster |
download MOPG08_POSTER.PDF [3.304 MB] |
| Conference |
IBIC2016, Barcelona, Spain |
| Series |
International Beam Instrumentation Conference (5th) |
| Proceedings |
Link to full IBIC2016 Proccedings |
| Session |
Monday Poster Session |
| Date |
12-Sep-16 16:00–18:00 |
| Main Classification |
BPMs and Beam Stability |
| Keywords |
electron, electronics, ion, pick-up, instrumentation |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Isidre Costa (ALBA-CELLS, Barcelona, Spain); Ubaldo Iriso (ALBA-CELLS, Barcelona, Spain); Francis Pérez (ALBA-CELLS, Barcelona, Spain); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-177-9 |
| Published |
February 2017 |
| Copyright |
|