MOOTH2 Commissioning of SuperKEKB ion, vacuum, emittance, detector 4
 
  • Y. Funakoshi
    KEK, Ibaraki, Japan
 
  After 5 years of upgrade work from KEKB, the Phase 1 beam commissioning of SuperKEKB started on Feb. 1st this year and finished at the end of June. In Phase 1, Belle-II detector and the final focus doublet (QCS) were not installed and no beam collision was performed. Missions of the commissioning in Phase 1 were startup of each hardware component, establishment of beam operation software tools, preparation of Belle-II detector, an optics study and tuning without QCS and the detector solenoid magnet and other machine studies. In this talk, achievements in the Phase 1 commissioning are summarized. Also a plan for the Phase 2 commissioning will be given.  