<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Watanabe, K.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             Improvement of Efficiency of Klystron to Apply the CPD Method
          </title>
       </titles>
		 <publisher>JACoW</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>978-3-95450-187-8</isbn>
		 <electronic-resource-num>10.18429/JACoW-eeFACT2016-WET3BH1</electronic-resource-num>
		 <language>English</language>
		 <pages>192-194</pages>
       <pages>WET3BH1</pages>
       <keywords>
          <keyword>ion</keyword>
          <keyword>klystron</keyword>
          <keyword>electron</keyword>
          <keyword>cavity</keyword>
          <keyword>radiation</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2017</year>
          <pub-dates>
             <date>2017-07</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-eeFACT2016-WET3BH1</url>
              <url>http://jacow.org/eefact2016/papers/wet3bh1.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          A high power RF system for the particle accelerators needs large electrical power in the operation. An improvement of efficiency is also always required as a technology component for the energy saving. To improve efficiency of a high-power source, the CPD (Collector Potential Depression) method already was applied a Gyrotron to recovery the electrical energy form the collector loss. The CPD is an energy-saving scheme that recovers the kinetic energy of the spent electrons after generating rf power. A CPD klystron (E37703 CPD) was fabricated at 2013, to recycle an existing klystron of Toshiba E3786. The purpose of our study is to demonstrate the proof-of-principle of the CPD method to apply a klystron. A plane of R&amp;D of CPD klystron at KEK will be reported in this meeting.
       </abstract>
    </record>
  </records>
</xml>
