After 5 years of upgrade work from KEKB, the Phase 1 beam commissioning of SuperKEKB started on Feb. 1st this year and finished at the end of June. In Phase 1, Belle-II detector and the final focus doublet (QCS) were not installed and no beam collision was performed. Missions of the commissioning in Phase 1 were startup of each hardware component, establishment of beam operation software tools, preparation of Belle-II detector, an optics study and tuning without QCS and the detector solenoid magnet and other machine studies. In this talk, achievements in the Phase 1 commissioning are summarized. Also a plan for the Phase 2 commissioning will be given.
|
| Paper |
download MOOTH2.PDF [2.484 MB / 5 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
eeFACT2016, Daresbury, UK |
| Series |
ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e^+e^- Colliders (58th) |
| Proceedings |
Link to full eeFACT2016 Proccedings |
| Session |
Overviews |
| Date |
24-Oct-16 10:15–13:00 |
| Main Classification |
Overviews |
| Keywords |
ion, MMI, vacuum, emittance, detector |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Ning Zhao (IHEP, Beijing, China); John Poole (CERN, Geneva, Switzerland); Volker RW Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-187-8 |
| Published |
July 2017 |
| Copyright |
|