<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Therasse, M.</author>
             <author>Barlow, G.</author>
             <author>Bizzaglia, S.</author>
             <author>Bousquet, J.A.</author>
             <author>Chrul, A.</author>
             <author>Demarest, P.</author>
             <author>Dequaire, J.</author>
             <author>Deschamps, J-B.</author>
             <author>Ferreira Somoza, J.A.</author>
             <author>Gayde, J.</author>
             <author>Gourragne, M.</author>
             <author>Harrison, A.</author>
             <author>Kautzmann, G.</author>
             <author>Mergelkuhl, D.</author>
             <author>Parma, V.</author>
             <author>Struik, M.</author>
             <author>Venturini Delsolaro, W.</author>
             <author>Williams, L.R.</author>
             <author>Zhang, P.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             First HIE-ISOLDE Cryo-module Assembly at CERN
          </title>
       </titles>
		 <publisher>JACoW</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>978-3-95450-178-6</isbn>
		 <electronic-resource-num>10.18429/JACoW-SRF2015-TUPB106</electronic-resource-num>
		 <language>English</language>
		 <pages>874-878</pages>
       <pages>TUPB106</pages>
       <keywords>
          <keyword>cavity</keyword>
          <keyword>vacuum</keyword>
          <keyword>pick-up</keyword>
          <keyword>insertion</keyword>
          <keyword>instrumentation</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2015</year>
          <pub-dates>
             <date>2015-12</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>http://dx.doi.org/10.18429/JACoW-SRF2015-TUPB106</url>
              <url>http://srf2015.vrws.de/papers/tupb106.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          The first phase of the HIE-ISOLDE project aims to increase the energy of the existing REX ISOLDE facilities from 3MeV/m to 5MeV/m. It involves the assembly of two superconducting cryo-modules based on quarter wave resonators made by niobium sputtered on copper. The first cryo-module was installed in the linac in May 2015 followed by the commissioning. The first beam is expected for September 2015. In parallel the second cryo-module assembly started. In this paper, we present the different aspects of these two cryo-modules including the assembly facilities and procedures, the quality assurance and the RF parameters (cavity performances, cavity tuning and coupling).
       </abstract>