Keyword: multipactoring
Paper Title Other Keywords Page
THP030 Superconducting RF Cavity Development With UK Industry cavity, SRF, accelerating-gradient, niobium 966
 
  • A.E. Wheelhouse, R.K. Buckley, L.S. Cowie, P. Goudket, A.R. Goulden, P.A. McIntosh
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • C.A. Cooper, C.M. Ginsburg, A. Grassellino, O.S. Melnychuk, A.M. Rowe, D.A. Sergatskov
    Fermilab, Batavia, USA
  • J.R. Everard, N. Shakespeare
    Shakespeare Engineering, South Woodham Ferrers, Essex, United Kingdom
 
  As part of a continuing STFC Innovations Partnership Scheme (IPS) grant, in support of enabling UK industry to address the large potential market for superconducting RF structures Daresbury Laboratory and Shakespeare Engineering Ltd are developing the capability to fabricate, process and test a niobium 9-cell 1.3 GHz superconducting RF cavity. A single-cell cavity fabricated under this grant was surface processed and tested at Fermilab, and achieved an accelerating gradient in excess of 40 MV/m at an unloaded quality factor in excess of 1.0 x 1010. This paper presents the results of the single-cell cavity testing and discusses the progress made to date in the development of the design and manufacture of a 9-cell niobium cavity, which Shakespeare Engineering Ltd will fabricate and which is anticipated to be qualified in 2014.  
 
THP054 Last Spiral 2 Couplers Preparation and RF Conditioning vacuum, cryomodule, controls, cavity 1036
 
  • Y. Gómez Martínez, M.A. Baylac, P. Boge, T. Cabanel, P. De Lamberterie, M. Marton, R. Micoud
    LPSC, Grenoble Cedex, France
 
  Six crymodules are ready to be installed in the SPIRAL 2 LINAC. We present here the protocols used for the preparation and for the RF conditioning of the couplers and the obtained results.  
 
THP065 Design of 352.21 MHz RF Power Input Coupler and Window for the European Spallation Source Project (ESS) operation, cavity, vacuum, SRF 1069
 
  • E. Rampnoux, S. Bousson, S. Brault, P. Duchesne, P. Duthil, G. Olry, D. Reynet
    IPN, Orsay, France
 
  A 352.21 MHz RF high power coupler window was designed by IPNO to meet the specification requirements for the ESS accelerator project. This designed is based on IPNO’s power coupler developments performed in the framework of the EURISOL Design Study project for which two power couplers using coaxial technology without chokes systems around the ceramic disc have been designed and tested successfully up to 20 kW RF power level in CW mode. For ESS project, the RF power input window was developed and designed to reliability operate at an average power level of 25 kW up to 300 kW in pulsed and continuous wave modes. This 352.21 MHz RF window was developed to remove the chocks usually used and provided the following advantages: more reliability, less expensive to manufacture, better vacuum, easier cleaning, less secondary electron-multipacting with specificity to present a bandwidth close to 1 GHz.