| Title |
Experience and Developments on the S-band RF Power System of the FERMI Linac |
| Authors |
- A. Fabris, P. Delgiusto, F. Pribaz, N. Sodomaco, R. Umer, L. Veljak
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
|
| Abstract |
The S-band linac of FERMI, the seeded Free Electron Laser (FEL) located at the Elettra laboratory in Trieste, operates on a 24/7 basis accumulating more than 6000 hours of operation per year. The performance and operability requirements of a users facility pose stringent specifications on reliability and availability on all the systems of the machine and in particular on the RF power plants. This paper provides a review and discusses the operational experience with the S-band power plants, klystrons and modulators, operating at S-band in FERMI. Based on the satisfactorily results and following return of experience, upgrades of the existing power plants are being implemented in the continuous effort of extending the operability and availability of the systems. A description of these activities and an overview of the other developments under consideration on the RF power plants are also provided.
|
| Paper |
download WEPMA042.PDF [0.718 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2015, Richmond, VA, USA |
| Series |
International Particle Accelerator Conference (6th) |
| Proceedings |
Link to full IPAC2015 Proccedings |
| Session |
Wednesday Posters (Madison) |
| Date |
06-May-15 16:00–18:00 |
| Main Classification |
7: Accelerator Technology |
| Sub Classification |
T06 - Room Temperature RF |
| Keywords |
klystron, operation, linac, FEL, high-voltage |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Stuart Henderson (ANL, Argonne, IL, USA); Evelyn Akers (Jlab, Newport News, VA, USA); Todd Satogata (JLab, Newport News, VA, USA); Volker R.W. Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-168-7 |
| Published |
June 2015 |
| Copyright |
|