| Title |
High Level Application for First Turns Commissioning in NSLS-II Storage Ring |
| Authors |
- S. Seletskiy, A. Blednykh, J. Choi, Y. Hidaka, B. Podobedov, G. Shen, L. Yang
BNL, Upton, Long Island, New York, USA
|
| Abstract |
The typical problems occurring during commissioning of the first turns in the storage rings include shorted coils or reversed polarity of the magnets, cross-cabling of magnets power supplies and reversed polarity of BPMs. In this paper we describe a dedicated high level control application, which was created and utilized for commissioning of the first turns in NSLS-II storage ring.
|
| Paper |
download TUPMA054.PDF [0.369 MB / 3 pages] |
| Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
| Conference |
IPAC2015, Richmond, VA, USA |
| Series |
International Particle Accelerator Conference (6th) |
| Proceedings |
Link to full IPAC2015 Proccedings |
| Session |
Tuesday Posters (Madison) |
| Date |
05-May-15 16:00–18:00 |
| Main Classification |
2: Photon Sources and Electron Accelerators |
| Sub Classification |
A05 - Synchrotron Radiation Facilities |
| Keywords |
software, storage-ring, GUI, lattice, controls |
| Publisher |
JACoW, Geneva, Switzerland |
| Editors |
Stuart Henderson (ANL, Argonne, IL, USA); Evelyn Akers (Jlab, Newport News, VA, USA); Todd Satogata (JLab, Newport News, VA, USA); Volker R.W. Schaa (GSI, Darmstadt, Germany) |
| ISBN |
978-3-95450-168-7 |
| Published |
June 2015 |
| Copyright |
|